(A) All new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions), greater than 50 lots or 5 acres, whichever is the lesser, shall:
(1) Identify the area of the special flood hazard and the elevation of the base flood.
(2) All final plans will provide the elevation(s) of the proposed structure(s) and pads. If the site is filled above the base flood elevation, the final lowest floor and grade elevations shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator.
(B) All subdivision proposals and other proposed development shall be consistent with the need to minimize flood damage. All subdivision proposals and other proposed development shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage. All subdivision proposals and other proposed development shall provide adequate drainage to reduce exposure to flood hazards.
(Ord. 2009-05, passed 10-5-2009; Am. Ord. 2018-01, passed 1-17-2018)