§ 91.24  PRE-EXCAVATION EQUIPMENT LOCATION.
   In addition to complying with the requirements of M.S. §§ 216D.01-216D.09, as they may be amended from time to time (One Call Excavation Notice System), before the start date of any right-of-way excavation, each registrant who has equipment in the area to be excavated shall mark the horizontal and approximate vertical placement of all the equipment.  Any registrant whose equipment is less that 20 inches below a concrete or asphalt surface shall notify and work closely with the excavation contractor to establish the exact location of its equipment and the best procedure for excavation.
(Ord. 152, passed 8-7-2000)  Penalty, see § 10.99