Any applicant who seeks to remove water from a storm water detention pond for irrigation purposes and to replenish the water in the storm water detention pond with a well must seek a permit from the city and provide the following information:
(A) Irrigation system plan;
(B) Detailed plan sheet showing the pumping outlet from the storm water detention pond;
(C) Detailed plan sheet showing the location of the well and the proposed inflow into the storm water detention pond;
(D) Management and maintenance plan detailing how the applicant will manage and maintain the irrigation system and the well;
(E) Projected annual pumping needs for the irrigation system; and
(F) Projected annual pumping needs for the well into the storm water detention pond.
(Ord. 162, passed 9-20-2005) Penalty, see § 10.99