§ 152.213 AS-BUILT DRAWINGS.
   All persons are required to submit as-built plans for any structures located on-site after final construction is completed. The plan must show the final design configurations for all stormwater management facilities and must be sealed by a registered professional surveyor or registered professional engineer licensed to practice in Tennessee. A final inspection by the Town is required before any performance security will be released.
(Ord. 2012-18, passed 11-12-12)