(a) The charge for making water taps shall be as follows:
In Village Outside Village
3/4 inch tap $500.00 $750.00
1 inch tap 600.00 900.00
All larger taps Labor and material Labor and material cost
cost plus 10% plus 50%
cost plus 10% plus 50%
(b) The charges herein established are for water taps only and shall not be a part of the water charge for water supplied to the consumer. All new service lines and replacement of old lines must be type K copper tubing or CTS water service plastic pipe and a minimum size of 3/4 inch inside diameter from existing curb stop to the meter on the premises.
(Ord. 1367. Passed 10-26-98; Ord. 1416. Passed 5-22-00; Ord. 1495. Passed 12-29-04; Ord. 1514. Passed 1-17-05; Ord. 1537. Passed 10-23-06; Ord. 1587. Passed 7-11-11; Ord. 1684. Passed 3-25-19.)