13.20.2.12: SEPTIC TANK WASTES:
   A.   Septic tank waste generated in city limits may be introduced into the POTW only at a designated receiving structure within the treatment plant area, and at such times as are established by the superintendent. Such wastes cannot violate this section or any other requirements established or adopted by the city. Wastewater discharge permits for individual vehicles to use such facilities will be issued by the superintendent.
   B.   Septage haulers may only discharge loads at locations specifically designated by the superintendent. No load may be discharged without prior consent of the superintendent. The superintendent may collect samples of each hauled load to ensure compliance with applicable standards. The superintendent may require the hauler to provide a waste analysis of any load prior to discharge.
   C.   Septage haulers must provide a waste tracking form for every load. This form must include, at a minimum, the name and address of the waste hauler, permit number, truck identification, sources of waste, and volume and characteristics of waste.
   D.   Fees for dumping hauled wastes will be established as part of the user fee system as authorized in section 13.20.13.1 of this chapter. (Ord. 3374 §2, 2010)