13.06.060: PERMANENT BULK WATER STATION USE:
   A.   Permanent bulk water stations shall be housed in buildings located at key sites around the city. The exterior of the station will have a standard two and one-half (21/2) NSF fire hose connection port approximately thirty six inches (36") above the ground.
   B.   Persons wishing to draw water from the permanent filling stations must submit a deposit for the access panel key for the fill stations to the city water department office at 3820 Ramsey Road.
   C.   After paying the deposit, the customer will be given an access key, a tabulation sheet, and a sheet of operating instructions. The customer shall return the sheets to the water department on a monthly basis or when they are finished using the station, whichever comes first. It is the customer's responsibility to ensure that the panel is locked after each use. (Ord. 3260 §4, 2006)