A. In addition to a sign permit, the applicant shall obtain a building permit when required by the currently adopted building code prior to installing the Sign.
B. In addition to a sign permit, the applicant shall obtain a State electrical permit when required by the currently adopted electrical code prior to installing the Sign. (Ord. 3698 §3, 2022)