§ 51.065 GENERAL PERMITS.
   All significant users proposing to connect to or to contribute to the POTW shall obtain a wastewater discharge permit before connecting to or contributing to the POTW. All existing significant users connected to or contributing to the POTW shall obtain a wastewater contribution permit within 180 days after the effective date of this chapter.
(Ord. passed 8- -2007, § 4.2.1)