All owners, tenants, and occupants of dwellings, houses, apartments, hotels, motels, mobile homes, manufactured housing, house trailers, mobile home parks, trailer camps, manufacturing or commercial establishments, or any other building of any kind or nature situated on a lot or lots within the city limits through which any city water line has been or is hereafter installed, or which abuts upon any street, alley, or easement within the city limits in which there is hereafter installed a water line or to which property a water line is extended shall, within 90 days following the date on which the water line is placed in operation, connect therewith all water usage lines of that dwelling, house, apartment, hotel, motel, mobile home, manufactured home, house trailer, mobile home park, trailer camp, manufacturing or commercial establishment, or other building, with the city water line system, thereby obtaining all water for use in that building from the city water system. Such connections shall be made in accordance with such rules and regulations as the city may from time to time duly establish.
(Prior Code, § 50.021) (Ord. passed 4-10-1989)