§ 150.21 GENERAL DUST CONTROL GUIDELINES.
   (A)   The quarry operator shall obtain and maintain all permits required pursuant to state and federal air pollution control laws and regulations.
   (B)   All trees and vegetation shall be left in place to the greatest extent possible.
   (C)   Overburden removal shall be limited to the area expected to be mined during operating season, except where the quarry operator desires to construct earthen berms around the quarry site or pit (in which case, if the areas so disturbed will not be mined within one year, they will be seeded and maintained in a permanent cover crop to prevent wind and water erosion). The quarry operator shall also provide town officials with a copy of an erosion control plan with Rule 5 (327 I.A.C. 15-5) as adopted by the State Water Pollution Control Board.
   (D)   Overburden berms shall be graded and seeded promptly following completion of the berm.
(Prior Code, § 6-113) (Ord. 1994-6, passed 5-9-1994) Penalty, see § 150.99