§ 51.04 TAP-IN AND CONNECTION CHARGES.
   (A)   The following fees shall be paid to the Utility Department to cover the cost of installing new services:
Type
Fee
Type
Fee
5/8” to 3/4” meter size (plus cost of meter)
$1,000
1” and greater meter size located within the town limits (plus time and materials and cost of meter)
$1,000
1” and Greater Meter Size Located Outside the Town Limits Including Access Fees
   5/8” or 3/4” meter size
$1,500
   1” meter size
$1,750
   2” meter size
$2,000
   3” meter size
$2,500
   4” meter size
$3,000
   6” meter size
$5,000
 
   (B)   (1)   If the water main from which a service is being made is located in the street pavement, additional charges for special backfill and pavement repair shall be made.
      (2)   If the main being tapped is located in a state highway, additional charges shall be made to cover state highway cut permit fees.
   (C)   (1)   For larger or special services, individual quotations will be given by the Department of Waterworks.
      (2)   In any event, charges will not be less than the charge for a two-inch connection.
(Prior Code, § 9-97) (Ord. 1995-2, passed 7-10-1995; Ord. 1997-4, passed 3-25-1997; Ord. 2003-6, passed 4-29-2003)