(A) Backfilling. All backfilling will be completed as follows.
(a) Backfilling will be done in 18-inch layers.
(b) Each layer shall be compacted using a plate compactor or other machine designed to compact the ground.
(B) Streets. If a cut is made in the street, the following guidelines shall apply.
(1) Fill sand may be used to cushion new lines to a level of approximately 18 inches below grade level.
(2) The final/top layer shall be filled using #53 gravel and compacted as stated above.
(3) After proper settling is allowed, the excavated area shall be paved using the following guidelines.
(a) If in season, a “hot mix” asphalt from a state approved facility shall be used and rolled or packed smooth and level with the existing roadway.
(b) If hot mix is not in season, cold patch from a state approved facility may be used temporarily and rolled or packed smooth and level with the existing roadway. However, the cold patch must be removed and replaced with hot mix asphalt as stated above when it becomes available.
(4) If a cut is made in a new road, the excavated area shall be saw cut so the patched area will be square and neat in appearance and the roadway shall be returned to its original material.
(5) The path shall be compacted, with the use of equipment designed for compacting, so the finish patch will be level with the roadway.
(6) The excavation site shall be monitored for a period of one year. Should the patched area sink, settle, or otherwise be deemed unacceptable by the Utilities Superintendent or his or her designee, the contractor or person responsible for the disturbed area shall be responsible for making the necessary repairs.
(C) Sidewalks. All sidewalks removed or damaged during excavation shall be replaced by the contractor, at the owner’s expense, as soon as practical. Concrete for the sidewalks shall be 3,000 LB PSI with fiber.
(D) Alleyways.
(1) If the alleyway is gravel, #53 gravel shall be used to fill the hole and packed in layers as to provide a smooth hard surface.
(2) If the alleyway is blacktop, the alleyway shall be returned to its original surface.
(E) Other areas of public rights-of-way. Contractors shall return all areas of public right-of-way back to its original state and monitor for settling for a period of one year as outlined in this subchapter after completion.
(Ord. 2005-0401, passed 6-15-2005)