§ 52.025 PERMIT.
   Before any person shall uncover, make any connection with or opening into, use, alter or disturb any public sewer or appurtenance thereof a written permit must be obtained from the city. The application for the permit shall set forth the location and description of the property to be connected with the sewer system and the purpose for which the sewer is to be used, and shall be supplemented by any plans, specifications or other information considered pertinent. The permit shall require that construction and connection of the building sewer to the public sewer be completed within 60 days after the issuance of the permit, except that when a property owner makes sufficient showing that due to conditions beyond the owner’s control or peculiar hardship, the time period is inequitable or unfair, an extension of time within which to comply with the provisions herein may be granted. Any sewer connection permit may be revoked at any time for a violation of these chapters. A connection permit shall not be issued to any person except a licensed sewer and drain layer.
(1999 Code, § 96.01) Penalty, see § 52.999