§ 53.39  CONTROL MANHOLES.
   (A)   When required by the Superintendent of the Waterworks, the owner of any property served by a building sewer carrying industrial wastes shall install a suitable control manhole in the building sewer to facilitate observation, sampling and measurement of the industrial wastes. The manhole, when required, shall be accessibly and safely located, and shall be constructed in accordance with plans approved by the control authority.
   (B)   The manhole shall be installed and maintained at the owner’s expense, so as to be safe and accessible at all times.
(2012 Code, § 88-183)