APPENDIX B: WASTEWATER FEE SCHEDULE
Fee Description
Fee
Fee Description
Fee
Application fee (non-refundable)
$200
Plan review fee (utility extensions/additions only)
   Base fee (up to ten connections)
$400
   Additional fee per ERU in excess of ten connections
$25
Tap fee
$7,500
Inspection fee
$100
Disconnection fee
$100
Reconnection fees (as applicable per superintendent)
   Reconnection fee (direct utility power)
$200
   Reconnection fee (secondary power)
$100
   Reconnection meter base/disconnect fee (as applicable)
$800
Removal fee
$1,250
Major contributor permit fee
$2,500
Major contributor surveillance survey fee
$300
Generator permit fee
$100
 
(Ord. 2017-03, passed 9-11-17)