§ 156.125 RESPONSIBILITY FOR MAINTENANCE.
   During the development of a site, the person conducting the land-disturbing activity shall install and maintain all temporary and permanent erosion and sedimentation control measures as required by the approved plan or any provision of this chapter, the Act, or any order adopted pursuant to this chapter or the Act. After site development, the landowner or person in possession or control of the land shall maintain all necessary permanent stormwater post-construction measures per the town's NPDES Phase 2 permit, except those measures installed within a road or street right-of-way or easement accepted for maintenance by a governmental agency.
(Ord. 2020-09-07, passed 9-21-20)