§ 155.10  RESUBDIVISION AND/OR REPLATTING OF LAND.
   (A)   Procedure for resubdivisions/replatting. If any change in an approved or recorded subdivision plat affects any street layout shown on such plat, any area reserved thereon for public use, or any lot line including the division of any lot by plat or otherwise that creates an additional building site on any lot located within a previously approved subdivision plat, such change shall be considered a replat of the entire previously approved plat and shall be approved by the Plan Commission by the same procedure, rules and regulations as for subdivisions. Such change also must be made in conformity with the statutes governing platting and vacating of public ways (I.C. 36-7-3 et seq., as amended).
   (B)   Procedure for subdivisions where future subdividing is indicated. Whenever a parcel of land is subdivided and the subdivision plat shows one or more lots containing more than one acre of land and there are indications that such lots will eventually be resubdivided into smaller building sites, the Commission may require that such parcel of land allow for the future opening of roads and the ultimate extension of adjacent roads. Easements providing for the future opening and extension of such roads may be made a requirement of the plat.
   (C)   Vacation of plats. Any recorded plat or part of any recorded plat may be vacated only in accordance with I.C. 36-7-3 as amended.
(Ord. 18-2007, passed 12-18-2007)