§ 150.26 FEES.
   (A)   Fees for electrical inspections for all electrical work with a cost of less than $50,000 per unit shall be as follows.
Type of Inspection
Fee
Type of Inspection
Fee
Construction service
$30
Final
$30 (For the first unit plus $1 per circuit exceeding 20 circuits and $10 for each additional attached unit)
Mobile home
$30
Reinspection (due to turndown, concealment of work, unapproved materials, or for any other reason)
One reinspection fee allowed – all additional re-inspections $30
Rough in
$30 (For the first unit and $10 for each additional attached unit)
Service change only
$30
Temporary on permanent (turn on water)
$30
All other inspections
$30
 
   (B)   Fees for electrical inspections for all electrical work with a cost of greater than $50,000 per unit shall be as follows.
Cost of Work
Percent
Cost of Work
Percent
$50,000 – $100,000
1.00
$101,000 – $200,000
0.95
$201,000 – $300,000
0.90
$301,000 – $400,000
0.80
$401,000 – $500,000
0.70
$501,000 – $1,000,000
0.60
Over $1,000,000
0.50
 
   (C)   Inspection fees for pre-constructed or pre-fabricated structures which are not affixed with a state electrical inspection certificate shall be the amount of $100.
   (D)   In addition to the fees hereinabove provided, there shall be a fee of $20 for every re-inspection made necessary by concealment of work, unapproved materials, or for any other reason.
(Prior Code, § 70.111) (Ord. 78-6, passed 10-3-1978; Res. passed 1-22-1997)