§ 55.11 REQUIREMENTS FOR BEST MANAGEMENT PRACTICES.
   (A)   Implementation. If the Director determines that a stormwater discharge into the MS4 is, or has the potential of, contributing to water quality degradation, has potential to cause any violation of this chapter or, causes a violation of the city’s OPDES Municipal Storm Water Discharge Permit, a BMP shall be implemented. The type and number of BMPs shall be addressed individually, with the initial implementation of nonstructural BMPs, followed by structural BMPs. The Director may require additional BMPs to be implemented for any discharge from a commercial, residential and industrial source.
   (B)   Spill BMPs. All persons and industrial facilities shall take measures to prevent spills or any other accidental introduction of pollutants into the MS4. These measures shall take the form of BMPs.
(Ord. 2007-25, passed 11-19-07)