§ 151.10 FOUNDATIONS OF DEMOLISHED BUILDINGS.
   Whenever a building or structure has been demolished, the foundation thereof, if any, shall be leveled to at least 42 inches below grade and filled in with 95% non-combustible fill material with the top 42 inches of fill material being of dirt, sand or gravel and no combustible material may be placed in said foundation which is not from the site. The fill material must be capable of supporting vegetative growth.
(Ord. 13, Series 2011-2012, passed 3-26-2012) Penalty, see § 151.99