§ 155.09 PROCEDURE FOR OBTAINING A PERMIT.
   (A)   An application for a sign permit shall be made and submitted at the office of the Building or Zoning Commissioner on the appropriate forms furnished by the administration.
   (B)   All applications for sign permits shall, at a minimum, include a scale drawing of the proposed sign, indicating the following:
      (1)   Height, size, and orientation of the sign and message contained thereon.
      (2)   Location of the sign on the lot or building, respecting all setbacks required by this chapter, by the city building code, or by the city zoning code.
      (3)   Type of materials from which sign is to be constructed.
      (4)   Method of illuminating and source of illumination for such sign.
      (5)   Any other information which may be required by the Building or Zoning Administrator to determine conformance with the regulations contained herein.
   (C)   The Building or Zoning Commissioner shall grant or deny an application for a sign permit within 30 days of its receipt. When an application for a permit is denied, the Commissioner shall briefly state in writing the reason for the denial.
(Ord. 06-14, passed 10-3-06)