The following minimum standards of improvements will be required as a condition precedent to approval of the plat by the Planning Commission or the City Council.
(A) All clearing and grubbing of streets and alleys shall be completed.
(B) Grading of streets and alleys shall be completed. Grading shall include satisfactory protection of slopes from erosion.
(C) Installation of a complete storm sewer system will be required.
(D) All streets shall be surfaced to a width of not less than 22 feet with material not inferior to asphalt conforming to city specifications for residential streets.
(E) Installation of sanitary sewers shall be completed if a usable trunk sewer is located within 500 feet of any boundary of the subdivision.
(F) If trunk sewers are not available, any required facilities for the disposal of sewage must conform to existing specifications on file in the City Engineer's Office.
(G) Water lines must be installed to service every lot where mains are available to the subdivision.
(`73 Code, 17.062, § 5.276) Penalty, see § 10.99