§ 68-71 SCHEDULE FOR INSPECTIONS.
   (A)   The schedule for inspections for cross connections shall be in accordance with the following general outline:
      (1)   Known or suspected secondary water supply cross connections shall be inspected first; (Surface water, class 3 wells, recirculated water, and the like.)
      (2)   Known or suspected submerged inlet cross connections will be inspected next.
   (B)   In general, emphasis will be placed on making inspections initially of all industrial and commercial establishments or where cross connections are known or suspected to exist. A general review will follow in a logical sequence as time permits.