§ 151.12 INSPECTION OF PRE-FABRICATED STRUCTURES.
   (A)   Applicants for permits for construction shall state the name of the general contractor or other individual who is wholly responsible for the conduct of construction on the site.
   (B)   A “Master Plan” for each single or multi-family building, commercial, or industrial building must be filed in this office incorporating all off-site constructed aspects of the structure as well as its final site assembly down to the foundation.
   (C)   The foundation plan shall include alt work proposed in the basement or crawl space area and not be limited to only those items provided by the modular home/office manufacturer. Additionally, this plan is not to be a “typical” foundation plan, but rather one prepared for the particular site to be occupied by the home/office.
   (D)   All sections of this chapter herein are applicable to pre-fabricated construction.
   (E)   Provide each unit with a minimum of two frost-proof hose bibs conveniently located on the front and rear exterior of house. The plans shall contain a complete plumbing isometric riser diagram for supply, drain waste, and vent lines. This diagram must indicate sizes and materials.
   (F)   The contractor or other individual obtaining the permit for the transportation into the Village of Channahon and the erection and/or installation of a re-fabricated unit will be held responsible once the unit arrives in the village for its total disposition including the arrangement for its immediate removal from the right-of-way once the unit arrives at the site. It is incumbent upon this individual to make adequate arrangements with the manufacturer and/or carrier to assure that roads and other property are not damaged while the unit is in transit through the village to the site, and further make arrangements for the immediate deposition of the unit at the construction site.
   (G)   Every modular unit shall contain a State of Illinois Certification affixed to the building. All modular homes must be properly labeled. An Illinois Registered Design Professional shall seal, sign, and date the document(s).
   (H)   All modular units shall comply with the Village of Channahon Building Ordinance. The manufacturer of the modular unit shall provide documentation of said compliance.
   (I)   Wrap on the underside of a modular home shall be removed on basement situations unless a flame-spread rating of 25 or less is indicated.
(Ord. 1885, passed 2-20-17)