A filing and engineering review fee shall be paid to the village treasurer at the time a subdivision or a preliminary plat is filed with the village clerk. The fee schedule shall be as follows:
Subdivision of 5 lots or less | $400.00 |
Subdivisions of more than 5 lots | 750.00 |
(Ord. 566-2012, 3-19-2012)