§ 53.20 REQUIREMENTS TO CONNECT.
   Each lot, piece or parcel of property in the city on which is situated any building from which sewage or waste of any kind is produced and/or disposed of is hereby required to be connected with the sanitary sewer system of the city within 6 months after the adoption of this subchapter, if sanitary sewer mains are within 75 feet of any boundary of the premises, or within 6 months after the mains are constructed to within 75 feet of the premises; and it shall be unlawful for any owner of any property to suffer the construction, operation or maintenance of any cesspool, septic tank or privy on the premises after the time.
(Prior Code, § 203.01) (Am. Ord. 2011-06-07D, passed 6-7-2011)