11-3-1: COSTS AND CHARGES OF DEVELOPMENT:
Costs and charges in connection with the planning and development of subdivisions shall be shared between the subdivider and the city according to the following schedule:
Plan Or Facility
Subdivider
City
Plan Or Facility
Subdivider
City
1. Preparation of vicinity plan
100 percent
0 percent
2. Preparation of preliminary plan and improvement drawings
100 percent
0 percent
3. Easements and rights of way "on site" and "off site"
100 percent
0 percent
4. Preparation of final plat and final engineering drawings and documents
100 percent
0 percent
5. Grading and draining streets "on site"
100 percent for all
minor and collector
Special negotiations with city council for all grading and drainage work over estimated costs of minor and collector streets
6. Grading and draining streets "off site"
Special negotiations with city council
Special negotiations with city council
7. Bridges and culverts
100 percent for all
minor and collector streets
Special negotiations with city council for the costs of bridges and culverts in excess of the cost of such facilities required for minor and collector streets
8. Street paving
100 percent
0 percent
9. Curb and gutter and curb cuts
100 percent
0 percent
10. Sidewalk
100 percent
0 percent
11. Street signs
100 percent
0 percent
12. Water supply
Convey water rights to city
City accepts entitlement
13. Water and sewer
100 percent for installing size of lines required to serve subdivisions or standard size lines, whichever is greater
For lines in excess of those required to be installed by subdivider, special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city - subject to repayment provisions as set forth under the water and sewer resolution
14. Water and sewer mains, off site
100 percent for
installing size of lines required to serve subdivision or standard size lines, whichever is greater - subject to repayment provisions as set forth under the water and sewer resolution
For lines in excess of
those required to be installed by subdivider - special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city -
subject to repayment provisions as set forth under the water and sewer resolution
15. Street lighting
100 percent for
easements and rights of way and installation of facilities
100 percent for maintenance of lights after installation
16. Electric utilities
100 percent
0 percent
17. Parks
0 percent
100 percent
18. Monuments
100 percent
0 percent
19. Canal and flood channel protection
Special negotiations with city council
Special negotiations with city council
20. Elimination of other environmental hazards
Special negotiations with city council
Special negotiations with city council
21. As constructed drawings
100 percent
0 percent
 
(Ord. 4-11-79A, 4-24-1979)