Costs and charges in connection with the planning and development of subdivisions shall be shared between the subdivider and the city according to the following schedule:
Plan Or Facility | Subdivider | City
|
Plan Or Facility | Subdivider | City
|
1. Preparation of vicinity plan | 100 percent | 0 percent |
2. Preparation of preliminary plan and improvement drawings | 100 percent | 0 percent |
3. Easements and rights of way "on site" and "off site" | 100 percent | 0 percent |
4. Preparation of final plat and final engineering drawings and documents | 100 percent | 0 percent |
5. Grading and draining streets "on site" | 100 percent for all minor and collector | Special negotiations with city council for all grading and drainage work over estimated costs of minor and collector streets |
6. Grading and draining streets "off site" | Special negotiations with city council | Special negotiations with city council |
7. Bridges and culverts | 100 percent for all minor and collector streets | Special negotiations with city council for the costs of bridges and culverts in excess of the cost of such facilities required for minor and collector streets |
8. Street paving | 100 percent | 0 percent |
9. Curb and gutter and curb cuts | 100 percent | 0 percent |
10. Sidewalk | 100 percent | 0 percent |
11. Street signs | 100 percent | 0 percent |
12. Water supply | Convey water rights to city | City accepts entitlement |
13. Water and sewer | 100 percent for installing size of lines required to serve subdivisions or standard size lines, whichever is greater | For lines in excess of those required to be installed by subdivider, special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city - subject to repayment provisions as set forth under the water and sewer resolution |
14. Water and sewer mains, off site | 100 percent for installing size of lines required to serve subdivision or standard size lines, whichever is greater - subject to repayment provisions as set forth under the water and sewer resolution | For lines in excess of those required to be installed by subdivider - special negotiations with city council for difference between cost of installing size of lines required for the subdivision and those required by the city - subject to repayment provisions as set forth under the water and sewer resolution |
15. Street lighting | 100 percent for easements and rights of way and installation of facilities | 100 percent for maintenance of lights after installation |
16. Electric utilities | 100 percent | 0 percent |
17. Parks | 0 percent | 100 percent |
18. Monuments | 100 percent | 0 percent |
19. Canal and flood channel protection | Special negotiations with city council | Special negotiations with city council |
20. Elimination of other environmental hazards | Special negotiations with city council | Special negotiations with city council |
21. As constructed drawings | 100 percent | 0 percent |
(Ord. 4-11-79A, 4-24-1979)