§ 151.14 FEE SCHEDULE.
   (A)   Permit valuations. Permit valuations shall be based on the latest version of the International Code Council Building Valuation Data (BVD), or by the use of the actual contract value as determined by the Building Official. Additional valuations shall be listed in division (D).
   (B)   Permit fee for a temporary certificate of occupancy. The permit fee for a temporary certificate of occupancy is 3% of the building permit fee for the first 30 days, 6% of the building permit fee for the second 30 days, and 9% of the building permit fee for the third 30 days.
   (C)   Fees based on valuations. Fees based on valuations shall be computed thru the use of Table 1-A.
         TABLE 1-A BUILDING PERMIT FEES (PROPOSED TABLE)
Total Valuation
Fee
Total Valuation
Fee
$1 to $500
$33
$501 to $2,000
$33 for the first $500 plus $5 for each additional $100
or fraction thereof, to and including $2,000.
$2,001 to $25,000
$97 for the first $2,000 plus $14 for each additional
$1,000 or fraction thereof, to and including $25,000.
$25,001 to $50,000
$545 for the first $25,000 plus $14 for each additional
$1,000 or fraction thereof, to and including $50,000.
$50,001 to $100,000
$897 for the first $50,000 plus $9 for each additional
$1,000 or fraction thereof, to and including $100,000.
$100,001 to $500,000
$1,384 for the first $100,000 plus $8 for each additional
$1,000 or fraction thereof, to and including $500,000.
$500,001 to $1,000,000
$4,503 for the first $500,000 plus $7 for each additional
$1,000 or fraction thereof, to and including $1,000,000.
$1,000,001 and up
$7,809 for the first $1,000,000 plus $5 for each $1,000
or fraction thereof.
 
   (D)   Additional valuations.
      (1)   Residential garages   $55.50 per square foot
      (2)   Covered decks/patios/carports   $21.60 per square foot
      (3)   Uncovered decks   $16.60 per square foot
      (4)   Mare motel   $5.00 per square foot
      (5)   Barns; wood/metal   $23.00/9.00 per square foot
      (6)   Sun room/Arizona room   $100.00 per square foot
   (E)   Other permit fees.
      (1)   Fences/walls
         a.   Arena/corral/split rail/metal rail   $20.00
            plus each linear foot   $0.05
         b.   Wood/chain link/wrought iron   $20.00
            plus each linear foot   $0.10
         c.   Masonry/concrete   $20.00
            plus each linear foot   $0.15
         d.   Retaining wall   $20.00
            plus each linear foot   $0.25
      (2)   Signs
         a.   Up to a $500 value   $50.00
         b.   $501 to $1,000 of value   $100.00
         c.   Each $100 above $1,000 of value            $10.00
      (3)   Demolition
         a.   Accessory structure   $25.00 flat fee
         b.   Single-family dwelling   $100.00 flat fee
         c.   Commercial   $200.00 flat fee
      (4)   Temporary trailers (sales/construction)   $500.00 flat fee
      (5)   Pools/spas/above ground   $50.00 flat fee
      (6)   Fountains/ponds   $50.00 flat fee
      (7)   Pools with standards on file   $500.00 flat fee
      (8)   Pools with no standards on file   $600.00 flat fee
      (9)   PV solar
         a.   Each module   $4.25 each
         b.   Other components   $16.25 each
      (10)   Water heater (change out like for like)   $50.00 flat fee
   (F)   Plan reviews.
      (1)   Plan review shall be 65% of the permit fee unless permit fee is a flat fee. In such cases the plan review fee shall be $0.
      (2)   The minimum plan review fee shall be $50 unless stated otherwise in division(B)(6)(a).
      (3)   Additional plan reviews caused by changes, lost plans or plan review comment sheets shall be $100 per hour (one-hour minimum).
      (4)   Standard plan annual renewal fee shall be $100.
   (G)   Inspections and re-inspections.
      (1)   Inspections outside normal building hours shall be $150 per hour with a minimum of two hours.
      (2)   Re-inspections after the first and one subsequent inspection shall be $100 each. Requires a 24-hour waiting period after each failed subsequent inspection.
      (3)   Inspections or services for which no fee is specifically indicated are $150 per hour.
   (H)   Additional fees.
      (1)   Request for certificate of occupancy for change of use group without construction shall be $50.
      (2)   The use of outside consultants for plan checking shall be the actual costs of the consultant plus the towns permit and plan review fees.
      (3)   Fees for permits after work requiring permits has already begun shall be two times the permit and plan review fees.
(Ord. O2011-13, passed 11-21-11)