§ 50.027 PERMITS FOR NEW CONSTRUCTION.
   All applications for building permits required for new construction of a residential or commercial building must first be submitted to the Town Engineer to determine if the building to be authorized by the permit will require a connection to the town's wastewater system. If the Town Engineer determines the building to be permitted will require connection to the town's wastewater system, the applicant shall immediately make application to the town for a sewer connection on forms approved by the town. This application for sewer connection shall be attached to the building permit. The property for which the building permit has been granted shall be liable for any and all applicable fees as set forth in this chapter. All applicable sewer fees and charges must be paid prior to the issuance of a certificate of occupancy.
(`87 Code, § 17-4-8) (Ord. 94-06, passed 3-7-94)