The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city, or the procedures set forth in appropriate specifications of the ASTM and the WPCF Manual of Practice No. 9. All such connections shall be made gas-tight and water-tight and verified by proper testing. Any deviation from the prescribed procedures and materials must be approved by the superintendent before installation.
(1993 Code, § 13.08.210) (Ord. 85-1, passed - -)