§ 52.045  BUILDING SEWER; MATERIALS AND INSTALLATION.
   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in the excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the city. In the absence of code provisions or in amplifications thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply.
(1993 Code, § 13.08.180)  (Ord. 85-1, passed - -)