CHAPTER 52: SUBSURFACE SEWAGE TREATMENT SYSTEMS
Section
General Provisions
   52.001   Purpose
   52.002   Intent
   52.003   Authority
   52.004   Definitions
   52.005   Scope
   52.006   Jurisdiction
   52.007   Abrogation and greater restrictions
   52.008   County administration
   52.009   State disposal system permit
   52.010   SSTS operation and effectiveness
   52.011   Validity
   52.012   Liability
SSTS Standards
   52.020   Standards adopted by reference
   52.021   Amendments to the adopted standards
   52.022   SSTS setbacks
   52.023   Determination of hydraulic loading rate and SSTS sizing
   52.024   Holding tanks
   52.025   SSTS construction in floodplains
   52.026   Class V injection wells
General Requirements; Retroactivity
   52.040   All SSTS
   52.041   Existing SSTS construction permits
   52.042   SSTS on lots created after January 23, 1996
   52.043   Existing SSTS without permits
SSTS Upgrade, Repair, Replacement, and Abandonment
   52.055   Failure to protect groundwater
   52.056   Imminent threat to public health or safety
   52.057   Reserved
   52.058   Abandonment
SSTS Construction Permit
   52.070   SSTS construction permit required
   52.071   SSTS construction permit
   52.072   Activities requiring an SSTS construction permit
   52.073   Activities not requiring an SSTS construction permit
   52.074   SSTS construction permit required to obtain building permit
   52.075   Conformance to prevailing requirements
   52.076   SSTS construction permit application requirements
   52.077   SSTS construction permit application review and response
   52.078   SSTS construction permit denied
   52.079   Appeal
   52.080   SSTS construction permit expiration
   52.081   Fees
   52.082   SSTS construction permit transferability
   52.083   SSTS construction permit suspension or revocation
   52.084   SSTS construction permit posting
SSTS Management Plan
   52.095   Purpose
   52.096   SSTS requiring management plans
   52.097   Required contents of an SSTS management plan
   52.098   Requirements for SSTS not operated under a management plan
SSTS Operating Permit
   52.110   SSTS requiring an operating permit
   52.111   SSTS operating permit application requirements
   52.112   SSTS operating permit department response
   52.113   SSTS operating permit terms and conditions
   52.114   SSTS operating permit expiration and renewal
   52.115   Amendments to existing SSTS operating permits not allowed
   52.116   SSTS operating permits not transferrable
   52.117   Suspension or revocation of SSTS operating permits
   52.118   Monitoring requirements for SSTS operating permits
Prohibitions
   52.130   Occupancy or use of a structure without a compliant SSTS
   52.131   Sewage discharge to ground surface or surface water
   52.132   Sewage discharge to a well or boring
   52.133   Discharge of hazardous or deleterious materials
   52.134   Conflicts of interest
Variances
   52.145   Variance requests
   52.146   Affected agency
   52.147   Board of adjustment
SSTS Practitioner Licensing
   52.160   SSTS practitioner licensing
   52.161   SSTS business license exemptions
   52.162   SSTS licensed designer responsibilities
   52.163   SSTS licensed installer responsibilities
   52.164   SSTS licensed maintainer responsibilities
   52.165   SSTS licensed service provider responsibilities
   52.166   SSTS licensed inspector responsibilities
   52.167   Periodically saturated soil disagreements
Administration
   52.180   Public education outreach
   52.181   Record keeping
   52.182   Annual report
SSTS Compliance Inspection Program
   52.195   Department responsibility
   52.196   New SSTS construction or replacement
   52.197   Existing SSTS compliance inspection
   52.198   Compliance criteria for existing SSTS
   52.199   Transfer of properties
Enforcement
   52.210   Notice of violation
   52.211   Cease and desist orders
   52.212   Civil remedies
   52.213   Interpretation
 
   52.999   Penalty