(A) The following information must be part of the documents submitted with the final application for a transfer station facility:
(1) Facility design and layout, including equipment configuration;
(2) Storage capacity of the facility;
(3) Final disposal point of waste managed at the facility;
(4) On-site traffic patterns;
(5) Operating plan; and
(6) Recycling and composting areas and operations, if any.
(B) Transfer station and canister systems design and operations must comply with agency requirements, as established in Minn. Rules Part 7035.2865, as it may be amended from time to time.
(Ord. 4C, passed 11-14-00)