(A) Public utility buildings and structures, structures such as substations or similar structures not customarily considered industrial in use, and radio and communication towers not considered “wireless communication facilities” are allowed in all zoning districts provided a conditional use permit is issued.
(B) This section shall be exempt from the minimum lot size requirements to permit a lot area less than the minimum required for the district in which the building or structure is located.
(C) In consideration of an application for a conditional use permit the Planning Commission shall consider:
(1) The operational plan and potential for future expansion;
(2) The landscape treatment options and requirements for screening where appropriate;
(3) The security and design standards to prevent trespassing; and
(4) The access and parking needs for the site.
(Ord. 47, passed 7-23-02; Am. Ord. 97-2021, passed 7-20-21)