§ 93.20 INSPECTION.
   (A)   Notice of completion. When the work under any permit hereunder is completed, the permittee shall furnish a completion certificate to the county showing the completion date for the work performed, identifying the installer and designer of record, and certifying the work was completed according to the county's requirements. The completion certificate shall be in accordance with Minn. Rules Part 7819.1300.
   (B)   Site inspection. Permittee shall make the work-site available to the county and to all others as authorized by law for inspection at all reasonable times during the execution of and upon completion of the work.
   (C)   Authority of Director.
      (1)   At the time of inspection, the Director may order the immediate cessation of any work which poses a serious threat to the life, health, safety, or well-being of the public.
      (2)   The Director may issue an order to the permittee for any work that does not conform to the terms of the permit or other applicable standards, rules, laws, conditions, or codes, so long as the nonconformance constitutes a "substantial breach" as set forth in M.S. § 237.163, subds. 4(c)(1) through 4(c)(5). The order shall state that failure to correct the violation will be cause for revocation of the permit. Within a reasonable time after issuance of the order, the permittee shall present proof to the Director that the violation has been corrected. If such proof has not been presented within the required time, the Director may revoke the permit pursuant to § 93.23.
      (3)   The cost of any action required by the Director shall be paid by the permittee.
(Ord. 91-2019, passed 2-5-19)