§ 51.017 PERFORMANCE OF CONNECTION WORK.
   (A)   (1)   Upon approval of any application for a water or sewer connection, the town shall do the excavating, lay the pipe, install a meter where necessary, make the connection to the main, fill the excavation and replace the surface of the street. The construction of the lines and laterals for the connection of water or sewer pipes on any lot with water and sewer pipes in any street, and the necessary excavation therefore, shall be done only by the town.
      (2)   An exception to this division may be approved by the Director of Public Works where the installation of the lines and laterals is done by a developer or his or her agent and where the water and sewer extension plan, as well as detailed plans and specifications, have been approved by the Director of Public Works. The connection work will be subject to inspection by the Director of Public Works, or his or her agents, and shall not be accepted by the town unless approved by the Director of Public Works. All cost of inspection shall be borne by the developer.
   (B)   No work shall commence without prior notification being given to the Director of Public Works.
   (C)   All work not done by the town shall be done by a licensed utility contractor. A copy of the utility contractor’s state license must be provided along with insurance or bond.
(Prior Code, § 50.57) Penalty, see § 51.999