925.10 CONTROL OF ADMISSIBLE WASTES.
   (a)    Each person who discharges industrial wastes to a Village sewer shall, within sixty days of receipt of official notice by the approving authority, prepare and file with the approving authority, a report that shall include pertinent data relating to the quantity and characteristics of the wastes discharged to the Village wastewater treatment facilities. Similarly, each person desiring to make a new connection to the public sewer for the purpose of discharging industrial wastes shall prepare and file with the approving authority, a report that shall include actual or predicted data relative to the quantity and characteristics of the waste to be discharged.
   (b)    When it can be demonstrated that circumstances exist which would create an unreasonable burden on the person to comply with the above time schedule, a request for extension of time may be presented for consideration by the approving authority who may, if warranted, issue an extension of time.
   (c)    Each person discharging industrial wastes into a public sewer shall construct and maintain one or more control manholes or access points to facilitate observation, measurement and sampling of his wastes, including domestic sewage. Control manholes or access facilities shall be located and built in a manner acceptable to the approving authority. If measuring devices are to be permanently installed, they shall be of a type acceptable to the approving authority. Control manholes, access facilities and related equipment shall be installed by the person discharging the waste, at his expense, and shall be maintained by such person so as to be in safe condition, accessible and in proper operating condition at all times. Plans for the installation of the control manhole or access facilities and related equipment shall be approved by the approving authority prior to beginning construction.
   (d)    The volume of flow used for computing industrial waste surcharges shall be the metered water consumption of the person as shown in the record of meter readings maintained by the Village. If the person discharging industrial wastes into the public sewers procures any part, or all, of his water from sources other than the Village, all or a part of which is discharged into the Village sewers, the person shall install and maintain at his expense, water meters of a type approved by the approving authority for the purpose of determining the volume of water obtained from these other sources.
   (e)    Devices for measuring the volume of waste discharged to the public sewer may be required by the approving authority if these volumes cannot otherwise be determined from the metered water consumption records of the Village. Metering devices for determining the volume of waste shall be installed, owned and maintained by the person, at his expense. Following approval for the installation of such devices, and installation, such devices may not be removed without the consent of the approving authority.
   (f)    Industrial wastes discharged into the Village sewers shall be subject to periodic inspection and a determination of character and concentration of such wastes. The determinations shall be made as often as may be deemed necessary by the approving authority. Samples shall be collected in such a manner as to be representative of the composition of the wastes. The sampling may be accomplished either manually or by the use of mechanical equipment acceptable to the approving authority. Installation, operation and maintenance of the sampling facilities shall be the responsibility of the person discharging the waste and shall be subject to the approval of the approving authority. Access to sampling locations shall be granted to the approving authority or its duly authorized representatives at all times. Every care shall be exercised in the collection of samples to insure their preservation in a state comparable to that at the time the sample was taken.
   (g)    Laboratory procedures used in the examination of industrial wastes shall be those set forth in "Standard Methods", Section 145. However, alternate methods for certain analysis of industrial wastes may be used subject to mutual agreement between the approving authority and the person. Determination of the character and concentration of the industrial wastes shall be made by the person discharging them, or his agent, as designated by the approving authority. The Village may also make its own analysis of the wastes and these determinations shall be binding as a basis for charges.
(Ord. 1979-5. Passed 5-14-79.)