The county shall require the developer to provide a surety or cash bond, irrevocable letter of credit, or other means of security acceptable to the county prior to the issuance of any building or grading permit for the construction of a development requiring SWM ESD, nonstructural or structural practices. The amount of the security shall not be less than the total estimated construction cost, inspection, and as-built certification of the SWM ESD, nonstructural or structural practices. The security required shall include provisions relative to forfeiture for failure to complete work specified in the approved SWM plan, compliance with this chapter, and other applicable laws and regulations and time limitations. The security shall not be released without a final inspection, submission of “as-built” plans and engineer’s certification, and proof of transfer of all required properties and easements.
(2004 Code, § 191-20) (Ord. 01-12, passed 9-27-2001; Ord. 04-07, passed 4-1-2004; Ord. 2010-05, passed 4-29-2010; Ord. 2018-11, passed 1-29-2018)