(A) The design of SWM plans shall be prepared by a professional land surveyor or engineer.
(B) If a stormwater BMP requires a dam safety permit or small pond approval, the design shall be prepared by a professional engineer.
(2004 Code, § 191-15) (Ord. 01-12, passed 9-27-2001; Ord. 04-07, passed 4-1-2004)