§ 16-5-15 OFF-SITE IMPROVEMENTS AND OVERSIZE DESIGN.
   (A)   Off-site improvements. The developer shall be responsible for the design and construction of any extensions or modifications to existing infrastructure, which is situated either in part or entirely outside of the subdivision's boundary (i.e. "off-site"), when said infrastructure is deemed inadequate to accommodate the full build-out of the subject development.
   (B)   Oversize design. When the Engineering Services Director deems that a required land improvement must be larger than that which is necessary to serve the subject development, the developer shall be responsible for all costs associated with its design and construction.
(Ord. 2021-05-15, passed 5-3-2021)