8-5-3: PRIVATE SEWAGE DISPOSAL SYSTEMS:
   A.   Private Systems Permitted: Where a public sanitary (or combined) sewer is not available under the provisions of subsection 8-5-2D of this chapter, the building sewer shall be connected to a private sewage disposal system complying with the provisions of this section. (Ord. 1361, 3-6-2006)
   B.   Permit Required; Application; Fee: Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the council. The application for such permit shall be made on a form furnished by the city (reference appendix 2 attached to ordinance 1361, on file in the office of the city clerk), which the applicant shall supplement by any plans, specifications and other information as deemed necessary by the council. A permit and inspection fee of fifty dollars ($50.00) shall be paid to the city at the time the application is filed.
   C.   Inspection And Approval By City: A permit for a private sewage disposal system shall not become effective until the installation is completed to the satisfaction of the city council. The city shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the council when the work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within seventy two (72) hours of the receipt of written notice by the city council. (Ord. 1361, 3-6-2006; amd. 2006 Code)
   D.   Specifications: The type, capacities, location, and layout of a private sewage disposal system shall comply with all recommendations of the state private sewage disposal licensing act and code 1 and with the state environmental protection agency. No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than   n/a  square feet. No septic tank or cesspool shall be permitted to discharge to any natural outlet.
   E.   Connection To Public Sewer When Available:
      1.   At such time as a public sewer becomes available to a property served by a private sewage disposal system, as provided in subsection 8-5-2D of this chapter, a direct connection shall be made to the public sewer in compliance with this chapter, and any septic tanks, cesspools, and similar private sewage disposal facilities shall be abandoned and filled with suitable material.
      2.   When a public sewer becomes available, the building sewer shall be connected to said sewer within sixty (60) days, and the private sewage disposal system shall be cleaned of sludge and filled with clean bank run gravel or dirt.
   F.   Operation Of Private System: The owner shall operate and maintain the private sewage disposal facilities in a sanitary manner at all times, and at no expense to the city.
   G.   Additional State Requirements: No statement contained in this section shall be construed to interfere with any additional requirements that may be imposed by the Illinois department of public health. (Ord. 1361, 3-6-2006)

 

Notes

1
1. 225 ILCS 225/1 et seq.