8-2-5: SERVICE TAP FEES:
The charge for providing service shall be as indicated below and shall be revised as determined necessary by the electric department. Contact the city clerk for current rates. (Ord. 1427, 8-17-2010)
   A.   Residential service: Applies to single-phase service with extension of primary limited to one hundred feet (100') and length of the secondary not to exceed seventy five feet (75'). Service voltage 120/240 volts single-phase.
Overhead:
 
Overhead:
 
 
Existing 60 ampere service changed to 100 amperes
No charge
 
Existing 100 ampere service changed to 200 amperes
$250.00 plus $5.00 per foot in excess of 75 feet for secondary extension
 
New 100 ampere service
$250.00 plus $5.00 per foot in excess of 75 feet
 
New 200 amperes service
$500.00 plus $5.00 per foot in excess of 75 feet
 
400 amperes
$1,000.00 plus $7.50 per foot in excess of 75 feet
 
Above 400 amperes
To be determined
Underground:
 
 
Up to 200 amperes
$800.00 plus $7.50 per foot in excess of 75 feet
 
400 amperes
$1,600.00 plus $10.00 per foot in excess of 75 feet
 
Above 400 amperes
To be determined
3-phase
To be determined
Tap charge of $500.00 for overhead service/$800.00 for underground (where possible) plus connection charge
Connection charge/overhead service
The customer shall pay 50% of the estimated cost to provide service. This shall include transformation, wire, conduit, metering, and any other material required
Connection charge/underground service
In addition to the tap fee the customer shall pay 60% of the estimated cost to provide service. This shall include transformation, wire, conduit, metering, and any other material required
Surcharge outside corporate limits
A 10% surcharge shall apply to all fees and charges when service provided is outside the corporate limits providing no extension of primary facilities required. If it is necessary to extend primary facilities the city of Carmi reserves the right to refuse service and in addition to the tap fee will charge 50% of the cost to provide service
 
   B.   Commercial service: Applies to single-phase service with extension of primary limited to one hundred feet (100') and length of the secondary not to exceed seventy five feet (75'). Service voltage 120/240 volts single-phase.
Overhead:
 
Overhead:
 
 
Up to 200 amperes
$600.00 plus $5.00 per foot in excess of 75 feet
 
400 amperes
$1,200.00 plus $7.50 per foot in excess of 75 feet
 
Above 400 amperes
To be determined
Underground:
 
 
Up to 200 amperes
$1,000.00 plus $7.50 per foot in excess of 75 feet
 
400 amperes
$1,200.00 plus $10.00 per foot in excess of 75 feet
 
Above 400 amperes
To be determined
3-phase
To be determined
Tap charge of $750.00 plus connection charge
Connection charge/overhead service
The customer shall pay 50% of the estimated cost to provide service. This shall include transformation, wire, conduit, metering, and any other material required
Connection charge/underground service
In addition to the tap fee the customer shall pay 60% of the estimated cost to provide service. This shall include transformation, wire, conduit, metering, and any other material required
Surcharge outside corporate limits
A 10% surcharge shall apply to all fees and charges when service provided is outside the corporate limits providing no extension of primary facilities required. If it is necessary to extend primary facilities the City of Carmi reserves the right to refuse service and in addition to the tap fee will charge 50% of the cost to provide service
 
   C.   Industrial/apartment complex: To be determined. Approximately fifty percent (50%) of the estimated installed cost including transformation.
   D.   Subdivision: To be determined. Approximately fifty percent (50%) of the estimated installed cost including transformation, plus the connection charge per lot ($800.00/200 ampere). The connection charge shall be refunded once service is requested and the fee is paid providing the request occurs within eleven (11) years of when construction began. After eleven (11) years, no refund. (Ord. 1427, 12-10-2012, eff. 12-10-2012)
   E.   Any person, firm or corporation requesting nonstandard service shall pay, prior to the time electric service is installed, a sum equal to fifty percent (50%) of the charge to the customer for the requested facilities. The remaining fifty percent (50%) of cost to be paid at completion of service installation and connection. The charge to the customer shall be determined by the Electric Department. (Ord. 1427, 8-17-2010)