After the issuance of a permit, no change shall be made in the location of the sewer works, the grade, materials, or other details from those described in the permit or as shown on the plans and specifications for which the permit was issued, except with written permission from the General Manager and/or District Engineer.
(Ord. 2024-02, passed 9-26-2024) Penalty, see § 36.999