All transmission pipelines (i.e., pipelines not required for local distributing network) and overhead transmission and substation lines in excess of 35kV and up to 100kV shall be a conditional use in all districts subject to the procedural requirements and standards stipulated in this subchapter and §§ 152.070 through 152.074 of this chapter.
(Prior Code, § 11-26-3) (Ord. 258, passed 5-4-2006)