A. The responsible party shall maintain all erosion, sediment and pollutant control measures, temporary and permanent, in proper functioning order.
B. The responsible party shall inspect, maintain, adjust, repair and replace erosion, sediment and pollutant control measures within 24 hours following a storm event to ensure that the measures are functioning properly.
C. During active ground-disturbing activity, the responsible party shall inspect erosion, sediment and pollutant control measures daily between October 1 and April 30.
D. All inspections conducted by a responsible party in divisions B. and C. above shall be noted in an inspection log indicating the date and time of the inspection. The inspection log shall be made available to the Director upon request.