§ 13.16.035 Pretreatment facilities.
   Industrial users shall provide necessary wastewater treatment as required to comply with this chapter and shall achieve compliance with all categorical pretreatment standards, local limits and the prohibitions set out in § 13.16.015 et seq. above, within the time limitations specified by the Public Works Director or other designee. Any facilities required to pretreat wastewater to a level acceptable to the city shall be provided, operated, and maintained at the industrial user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the city for review, and shall be acceptable to the city before construction of the facility. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying the facility as necessary to produce an acceptable discharge to the city under the provisions of this chapter.
(Ord. 1413 § 3.1, passed 4-1-2015)