Applications for permits to make excavations within rights-of-way or street cuts within the city shall be submitted upon forms to be provided by the city and shall be accompanied by drawings, plans and specifications in sufficient detail to demonstrate:
A. That the facilities will be constructed in accordance with all applicable codes, rules and regulations;
B. That the facilities will be constructed in accordance with a franchise agreement, if applicable;
C. The location and route of all facilities to be installed aboveground or on existing utility poles;
D. The location and route of all new facilities on or in the public rights-of-way to be located under the surface of the ground, including the line and grade proposed for the burial at all points along the route which are within the public rights-of-way. Existing facilities shall be differentiated on the plans from new construction;
E. The location of all of applicant’s existing underground utilities, conduits, ducts, pipes, mains, and installations which are within the public rights-of- way along the underground route proposed by the applicant. A cross-section shall be provided showing new or existing facilities in relation to the street, curb, sidewalk or right-of-way; and
F. The construction methods to be employed for protection of existing structures, fixtures and facilities within or adjacent to the public rights-of- way, and description of any improvements that applicant proposes to temporarily or permanently remove or relocate.
(Ord. 1035, passed 11-3-1999; Am. Ord. 1313, passed 7-15-2009)