1141.06 ENGINEERING CONSTRUCTION PLANS REVIEW BY THE TECHNICAL REVIEW GROUP.
   In preparing required engineering construction plans, the applicable provisions of the municipality's Subdivision Regulations shall be followed. All improvements required by Chapter 1141 and by the Subdivision Regulations shall be installed at the cost of the developer in accordance with design and construction standards of the municipality. Engineering construction plans submitted in accordance with this chapter shall contain the information in Section 1141.05 in addition to the following:
   (a)   Existing topography with a maximum two (2) foot contour intervals and the proposed finished grading by contour.
   (b)   Provisions for the adequate disposition of natural and storm water on and off-site, in accordance with current design criteria and construction standards of Canal Winchester including, but not limited to, the calculation of the contributing drainage area in acres and the location, size, type and grade of ditches, catch basins, inlets, pipes, and other drainage structures.
   (c)   All existing and proposed sanitary sewer facilities indicating all pipe sizes, types, grades, invert elevations, location of manholes, and such other data as may be deemed necessary by the Municipal Engineer.
   (d)   All existing and proposed water facilities including all water mains, their sizes, valves and fire hydrant locations. A detailed water connection plan sheet shall be provided indicating the size and location of the water line connection into the building(s), back flow prevention and, when applicable, the size and location of the fire suppression line.
   (e)   A landscaping and lighting plan.
   (f)   The location, width, size, and intended purpose of all easements and rights-of-way and whether they are to be publicly or privately maintained. A plan copy, suitable for recording, shall be submitted showing any rights-of-way and/or easements for public dedication.
      (Ord. 53-07. Passed 9-4-07.)