901.03 RESTORATION OF PAVEMENT.
   (a)   Where openings have been or are to be made in a street, the permit shall direct the restoration of the street pavement in one of the following ways:
      (1)   The entire work of restoration, including both paving surface and paving base, may be performed directly by the Street Department after the permittee has completed the backfill.
      (2)   The paving surface may be installed by the Street Department after the permittee has made the backfill and installed the pavement base.
      (3)   The work may be done completely as in subsection (a)(1) hereof, or as to paving surface only as in subsection (a)(2) hereof, by a City contractor thereunto duly authorized by a contract with the City.
      (4)   The entire work of restoration may be done by the permittee with the consent of the City Engineer.
   (b)   In all cases, the entire work shall be carried out under the direction and to the satisfaction of the City Engineer, and in accordance with rules, regulations and specifications approved by Council. The permittee shall be responsible for the condition of all restorations made by him for a period of five years and upon notice shall repair any defect therein. Upon failure to repair, the City may make necessary repairs and charge the cost to the permittee.
(Ord. 14-1962. Passed 9-18-62.)
   (c)   All brick street surfaces, brick sidewalks, or flagstone sidewalks disturbed during construction or excavations shall be restored to their original state. All street opening permits, as well as construction drawings and specifications prepared for City infrastructure projects, shall state or comply with this requirement.
(Ord. 71-94. Passed 12-6-94.)